Engineering

1.  A 60 HZ single phase, two wire overhead line has solid cylindrical copper conductors with 1.5cm diameter. The conductors are arranged in horizontal configuration with 0.5m spacing.Calculate in mH/km:

a.)The inductsnce f each conductor due to internal flux linkages only.

b.) The inductance of each conducordue to both internal and external flux linkages.

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now

c)The total inductance of the line.

 

2. Rework problem 1 if the diameter of each conductor is:

a.)Increased by 20% to 1.8cm.

b.) Decreased by 20% to 1.2cm, without changing the phase spacing.

Compare the results with thoseof problem 1.

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"