A regular polygon has 24 sides what is the interior of each angle Each exterior angle of a regular polygon is…

A regular polygon has 24 sides what is the interior of each angle Each exterior angle of a regular polygon is 18 how many sides does the polygon have The sum of the interior angles of a polygon is 5400 how many sides does the polygon have
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

the term —————- is the part of a software system that interacts directly with the user.

the term —————- is the part of a software system that interacts directly with the user.
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

what is inertia?

what is inertia?
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Your contracted Health First Hospital Foundation (HHF), a charitable organization services community clinics Atlanta, Georgia. De organization’s tremendous growth, computerize…

Your contracted Health First Hospital Foundation (HHF), a charitable organization services community clinics Atlanta, Georgia. De organization’s tremendous growth, computerize operations. By so, HHF continue meet benefactors employees. To end, decided move operating a modern facility, install a Local Area Network (LAN),
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Eco 550

Note: The following is a regression equation. Standard errors are in parentheses for the demand for widgets. QD = – 5200 – 42P + 20PX + 5.2I + .20A + .25M (2.002) (17.5) (6.2) (2.5) (0.09) (0.21) R2 = 0.55 n = 26 F = 4.88 Your supervisor has asked you to compute the elasticities for each independent variable. Assume the following values for the independent variables: Q = Quantity demanded P (in cents) = Price of the product = 500 PX (in cents) = Price of leading competitor’s product = 600 I (in dollars) = Per capita income of the standard metropolitan statistical area (SMSA) in which the supermarkets are located = 5,500 A (in dollars) = Monthly advertising expenditures = 10,000 M = Number of microwave ovens sold in the SMSA in which the supermarkets are located = 5,000 Title (only for Xoon) As discussed Category : Eco Price: $30
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

account

can u please eplain it in details

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

demand and quantity

Following are observation on the market price and the quantity of good X produced and consumed in three different years: $10 and 100 units, $4 and 57 units, and $8 and 88 units. Can we conclude that the market demand for X slopes upward?
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

On February 25, 1982, Acme Construction Co. contracted with the United States Navy to remodel the engine maintenance shop at…

On February 25, 1982, Acme Construction Co. contracted with the United States Navy to remodel the engine maintenance shop at Mir Mar Marine Corps Air Station. The contract price was $750,500. The work included installation of heating, ventilating and air conditioning systems (HVAC). A chilled water system was part of the HVAC. In preparing his bid for the work, Acme solicited “budgetary bids” from subcontractors. These bids are used as the basis for estimating the component parts of the work and as back-up protection if other bids are not received. Coyote Sheet Metal (Coyote), had submitted a $94,000 bid to Acme for the HVAC exclusive of the chilling water system which would cost an additional $16,000 to the proposed bid. Acme contacted Roy Runner and told Runner that another subcontractor (E. Fudd) had put in a $86,500 bid to do the HVAC work and that this bid had a 20% profit margin, but for personal family reasons he could not sign a contract and go forward with the project. Runner met with the president of Acme (Roger Rabbit) who related Fudd’s assurance to him “there was a profit in it” and Runner signed that same day a contract identical to that turned down by Fudd. Fudd later told Runner at the time he had not done “much examination” of the plans or specifications. He was asked for his opinion of the newly signed deal and after checking the job site and the plans more closely, Fudd told Runner the cost of the job “far exceeded” the contract price. The plans included the chilled water system in the HVAC which cost an additional $16,000 not contemplated by the contract. Runner promptly told Acme the $86,500 price would not cover the HVAC with the chilled water system and unless the parties modified the amount, he could not do the work. Acme’s Rabbit responded with the comment he would get another contractor and “sue [Runner] for the difference.” Acme then turned back to Coyote Sheet Metal, awarding two subcontracts to Coyote; one for $94,000 and one for $16,000 for the HVAC with the chilled water system and sued Runner for the difference between his bid ($86,500) and the combined Coyote bids ($110,000). What legal issues do you believe are raised by the dealings of the parties in this case? Identify the issues and discuss what you believe will be the outcome of the case.
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Katelyn tossed a die onto a black-and-red checkerboard. What is the probability that it will land with a value of…

Katelyn tossed a die onto a black-and-red checkerboard. What is the probability that it will land with a value of five, on a red square?
 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"