Perform a simulated stakeholder meeting to discuss the scenario below. Students will be… 1 answer below »

You are required to perform a simulated stakeholder meeting to discuss the scenario below. Students will be assigned a role to play in the simulated stakeholder meeting. Roles will be assigned to ensure each group has one of each of the stakeholders. To do this assessment, it is necessary for you to know the responsibilities and interests of the stakeholder that you are assigned to be. To assist you with this knowledge, each stakeholder’s general scope of responsibilities is described below. It is suggested that you take some time to research more about each stakeholder’s responsibilities so that you can contribute effectively to the meetings and write your white paper.

Attachments:

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Generate a plot similar to Figure 8.10 for a 5-bit converter if the input signal is 2.25 V and… 1 answer below »

Generate a plot similar to Figure 8.10 for a 5-bit converter if the input signal is 2.25 V and the input range is  5 V to 5 V. What is the correct digital output?

 

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Over the years, National Association of Home Builders (NAHB) has periodically conducted “constr


Over the years, National Association of Home Builders (NAHB) has periodically conducted construction cost surveys to collec Over the years, National Association of Home Builders (NAHB) has periodically conducted “construction cost surveys” to collect information from builders on the various components that go into the price of a typical single-family home. NAHB's 2017 construction cost survey was conducted by emailing a questionnaire to a representative sample of 4,267 home builders. The average home in the NAHB survey was built on 11,186 square feet (about 1/4 acre) of land, included 2,776 square feet of finished floor area, and sold for $427,892. Using the Chapter 5- User Guide to the PMBOK 4th edition – Project Scope Management course a guide (is on the internet), the NAHB survey data, and the project WBS provided below with cost apportioned by different percentages, complete the homework questions with the assumptions material as that follow: Imagine that you are planning to build a smaller 1,176 square-foot house, and the average price for a lot and house similar to the one you envision is consistent with the NAHB survey in (S) cost per finished square foot floor area. Fortunately, you and your friends are comfortable doing some of the work yourselves to save money. The following average cost information is available from your lending bank that makes loans to local home builders, and disperses progress payments to contractors when specific tasks are verified as complete: A) Site Work-6.7 % Foundations-10.7 % Framing- 17.3 % Exterior Finishes- 13.9% Major Building Control Systems (HVAC, Electrical, Plumbing)- 13.8 % Interior Finishes- 28.6 % Landscaping and Clean-Up-7.0 % Other- 2.0 % B) What is the estimated cost per square foot rate for your new home based on the NAHB survey data? Based on the cost per square foot of finished floor area that you calculated in 1), what is the total estimated cost for your new home if you use contractors to complete all the tasks involved in building the hours? Estimate the total cost of the house if you and your friends complete the Landscaping & Clean-up and Other on your own? Why should the bank have combined, or why should the bank have not combined Site Work Foundations, and Framing in one large percentage (34.7 % ) category for the first payment to the contractor?

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Create a simple application for a restaurant menu iOS using Xcode 8.2+ (Swift 3)….

In this assignment, you will create a simple application for a restaurant menu iOS using Xcode 8.2+ (Swift 3).This assignment will test your IOS development skills and is worth 10% of your overall unit mark. This is an individual assignment.

Tasty’s Corner is a restaurant in Melbourne West. They specialize in Mediterranean and Asian Cuisine. You have been tasked with developing a simple application. YOU SHOULD display these two cuisines in your app as sections in table view.

Task 1

In each section you have to list out at least 3 cuisines. The design of the main screen is open to your creativity. (Refer Lab 10)

Task 2

Please assign an app icon and launch image for your app. (Refer Lab 11)

Task 3

Your Restaurant application must work with Auto Layout. The user interface will adjust to an iPhone or iPad in Landscape or Portrait orientation. (Refer Lab 12)

Task 4

When a user taps the Cuisine in the table view, it opens another View, displaying details of the selected cuisine.

Task 5

Add a feature that allows the user to rate the cuisine below its description.

Task 6

Add any one additional feature such as – an image of the selected cuisine along with its description etc.

Some Expectations

Your table view controller, has a single view – the table view. However, in your details view controller, you will need different views – for example, a view for the name of the cuisine, a view for the image, a view for the rating and other views you may deem necessary.

Submission Instructions

· Zip up the entire Assignment 2 folder, and any sub-folders, in which youhave created your solution for thisassignment.

· Name the ZIPfile Surname_Firstname_studentid_Assignment2.ZIP

· Submit the zip file to DropBox onVUcollaborate

Code

•The solution must be an Xcode Project.

Note

Late submissions will be evaluated with a penalty of 5% per day for a max of one week. No submission will be accepted a week after the due date. For any special circumstances, please contact the unit convener.

Plagiarism

THIS IS AN INDIVDUAL PROJECT.

  • The submitted work must be your own work.
  • Do not share your work with other students.
  • You may NOT view the code of other students.
  • You may discuss the work with teaching staff.
  • You may discuss the big picture with peers, but the final design should be yours.
  • You must name and code attributes and operations on your own.
  • There will be absolutely no tolerance of plagiarism.
  • Any person that presents any work that is not their own or is not properly referenced will be awarded 0 marks for the project.

Note 1: Ensure you include any images you use in your app should be in the same app directory. You should test your application on another machine before submitting.

Marking Criteria

Total 20 pts

Not attempted to Poor

Average to Good

Excellent

Task 1

(3pts)

Not attempted atall or only alittle.

(0-1 pts)

Partially implemented or design is not creative

(1-2 pts)

Fully implemented, navigation presents,app icon, pictures,

design is creative(3 pts)

Task 2 (3pts)

Not attempted at

all or only a little.

Partiallyimplemented

or screen is crowded, design is notintuitive

Fully implemented,

all requirements are presented to the user in an intuitive design

(0-1 pts)

(1-2 pts)

(3 pts)

Task 3 (3pts)

Not attempted at all or only a little.

Partially implemented or issues with navigation, or design isnot friendly

Fully implemented, all requirements arepresent.

(0-1 pts)

(1-2 pts)

(3pts)

Task 4 (3pts)

Not attempted at all or only a little.

Partially implemented or issues with navigation, or design isnot friendly

Fully implemented, all requirements arepresent.

(0-1 pts)

(1-2 pts)

(3 pts)

Task 5 (4pts)

Not attempted at all or only a little.

Partially implemented or issues with navigation, or design isnot friendly

Fully implemented, all requirements arepresent.

(0-1 pts)

(1-3 pts)

(4 pts)

Task 6 (4pts)

Not attempted at all or only a little.

Partially implemented or issues with navigation, or design isnot friendly

Fully implemented, all requirements arepresent.

(0-1 pts)

(1-3 pts)

(4pts)

Total 20 pts

Weight 10%

*End of Assignment 2*

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

A cargo aircraft has a linearized relationship between altitude ??(??) in metres and elevator…

A cargo aircraft has a linearized relationship between altitude ??(??) in metres and elevator angle ??(??) in

degrees given by the following differential equation.

Each student will work on a different differential equation, specified by the parameters ??, ??, ?? and ?? as

specified in the accompanying table (refer to the table with respect to the last two digits of your Curtin ID

number). The performance objectives for each student will also be the same, except for the desired

bandwidth ????

, and the ramp tracking error ???? which will be specified individually.

An autopilot system is being designed which will regulate the aircraft altitude. The altimeter provides an

electrical signal in proportion to the aircraft altitude.

A compensator ??(??) will drive the elevator position in response the error ??(??) between the aircraft

altitude and a reference altitude ????(??). The resulting final design should have the following properties:

1. The loop gain ??(??) = ??(??) * ??(??) should have a unity gain crossover frequency ???? rad/s

(within 5%)

2. a phase margin of at least 55º,

3. zero steady-state error in response to unit step inputs

4. steady-state tracking error less than ????

in response to unit ramp inputs.

5. reference signals (or noise) at a frequency of 100????

is attenuated by a factor of at least

0.001 (-60dB)

If possible within the above constraints, you should aim to achieve the shortest settling time you

can for the closed-loop step response (however the specific settling time that is possible will

depend on your particular parameter set).

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Extrapolation of binary diffusivity to a very high temperature, a value of DAB = 0.151 cm2/s has…

Extrapolation of binary diffusivity to a very high temperature, a value of DAB = 0.151 cm2/s has been reported1 for the system CO2-air at 293K and 1 atm. Extrapolate DAB to 1500K by the following methods:

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

Draw a circuit of robot for the following scenerio only circuit not code. By using ardino and h-brid

Draw a circuit of robot for the following scenerio only circuit not code. By using ardino and h-bridg and dc motor

No sensoer.

VICHAEL start from A move some distance till point B

than turn 90 degree than move some distance till C

than turn 90 degree and move Tell point D

than turn 90 degree and move till start point which is A

As square moving (, starting from A and back to A) Attached

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

1. what might be the effects of increasing amounts of UVR on productivity?2. what direct and indirec

1. what might be the effects of increasing amounts of UVR on productivity?2. what direct and indirect effects does/might increasing UVR have on animals?3. Suggest an apporach to counteract increased levels of UVR in ecosystems. What would you need to find out to ensure that your apporach is a wise one?

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

You have completed software requirement specification (SRS) and system design…

1. Overview

You have completed software requirement specification (SRS) and system design

specification (SDS). However, uncertainty may exist with the specifications. Had the

client described their requirements accurately or did I understand the requirements

correctly? Does the input and/or output of a designed process satisfy users or is the

human-machine interaction user-friendly? Moreover, business and product

requirements often change as development processes. In these or other situations,

a prototyping paradigm offer an approach to removing the uncertainty and making

changes earlier so as to improve project productivity. The prototype is used as a

proof of concept exercise. The aim is to resolve uncertainty about:

? functional requirements

? operation sequences

? user support needs

? required representations

? the look and feel of the interface, including layout, colours, fonts

You are required to

1. design your prototype in a prototype design document,

2. code the prototype according to the design,

3. have your client/users run the prototype and collect client/users feedback, and

4. update your SRS and/SDS, if necessary.

2. Document contents and prototype features

Before coding the prototype, you should design the prototype based on your specific

aims of the prototype. You should not put the cart before the horse. For example,

don’t use screen shots of the prototype in your storyboards of the design. You can

use some components of the SDS for the prototype design, but you should not

include those that are not relevant to your prototyping aims.

The prototype design document should be complete, including:

? A title that is specific for your software

? A brief description of the software

? Descriptions of your prototyping objectives and individual design items

? A navigation map or a chart of prototype structure

? Storyboards/Screen Makeups for screen/menu or report/form design

When you design the prototype, you must consider prototype features.

Attachments:

 

"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"